Skip to content
Latest news
Bacolod – 65MWp
Arayat – 42MWp
General Santos City – 1MWp
General Santos City – 570kWp
Cabuyao – 9.46MWp
Edward Marcs Philippines Incorporated

Total Solar Energy Solutions Provider

Edward Marcs Philippines Incorporated

  • Home
  • About Us
  • Products
    • Solar Photovoltaic Panels
    • Sedna Aire Solar Aircon
    • Empire Sun Solar Water Heater
    • Ecogen Heat Recovery
    • Ecogen Heat Pump
    • Solar Panel and Accessories
    • Solar Street Light
  • Blog
  • Contact Us
  • Southsun
  • Sedna Aire

Total Solar Energy Solutions Provider

Edward Marcs Philippines Incorporated

  • Home
  • About Us
  • Products
    • Solar Photovoltaic Panels
    • Sedna Aire Solar Aircon
    • Empire Sun Solar Water Heater
    • Ecogen Heat Recovery
    • Ecogen Heat Pump
    • Solar Panel and Accessories
    • Solar Street Light
  • Blog
  • Contact Us
  • Southsun
  • Sedna Aire
Our Products

Solar Photovoltaic Panels

jeromemmiranda - May 16, 2018May 17, 2018
Our Projects

Ecogen Heat Recovery Pump

jeromemmiranda - May 16, 2018July 18, 2018

About the Project: Ecogen Heat Recovery Water Heating System installed in various food court. Client: Megaworld Corporation Location: Eastwood City Cyberpark, City Place Square Binondo, Lucky China Town Mall

Renewable Energy: Protecting the Earth

jeromemmiranda - November 17, 2017November 21, 2017

THE heightened awareness about renewable energy resources and the growing passion to be actively involved in protecting Mother Earth came with the growing concern over climate change coupled with the [ … ]

Posts navigation

Older posts
Newer posts

Follow us on Twitter

Tweets by @edwardmarcs

Recent Posts

  • Bacolod – 65MWp September 10, 2025
  • Arayat – 42MWp September 10, 2025
  • General Santos City – 1MWp September 10, 2025
  • General Santos City – 570kWp September 10, 2025
  • Cabuyao – 9.46MWp September 10, 2025

Find Us

Most Popular

Bacolod – 65MWp
System Administrator - September 10, 2025
Cabuyao – 9.46MWp
System Administrator - September 10, 2025
General Santos City – 570kWp
System Administrator - September 10, 2025

Search

Powered by WordPress | Theme: Greatmag by aThemes.